10 m³ Grab Dredger

Technical Specifications
Project Background and Challenges
The vessel supports channel dredging and quay construction, working in silt, sand, harder soils and rock. A 10 m³ grab is a large unit giving high output per bite, but it places higher demands on positioning, the lifting gear load path and control of list during working cycles.
Our Solution
The layout is organised around grab operation: a working side with grab station and hopper, lifting gear sized for a fully loaded 10 m³ grab with dynamic factors, and a wide flat-bottomed hull for working stability. Spuds and winch systems control position, hopper capacity matches dredged volume and barge transfer cycles, and local structure at the grab base, boom supports and hopper coaming is strengthened. Ballast can be adjusted to counteract list during single-side working.
Delivery and Results
The concept design defines a 10 m³ grab dredger with large grab and hopper transfer arrangement for channel dredging, basin excavation and quay foundation works, meeting underwater excavation needs in port construction and channel maintenance.